From Merschbrock you receive the complete services of professional project management of your plastic products: from development, project planning and production suitable for plastics, to quality management, storage and logistics.
Forward-looking project management, our patented automation techniques and our experience in quality control are the decisive Merschbrock features that result in a product with maximum economic benefit.
More Impulses: Merschbrock is your reliable producer and supplier when you need exactly that and your creative driving force when you are looking for a partner who will accompany you in the development of your product from the very beginning. We work reliably according to your exact specifications or inspire you with innovative processes – just as you wish.
More Diversity: Merschbrock has been at home in all relevant markets with a wealth of experience since 1978. In over 45 years, we have always used the latest technology, developed innovative automation systems (some patented) and continuously optimised our processes. We know what matters and what our customers expect from us.
More Reliability: Our products can be found in your machines, your vehicles or your medical equipment. We are therefore not only aware of our responsibility, but also of the requirement to maintain your trust: Continuous high quality and routine processes in a partnership over many years.
IATF 16949 (QM system) – DIN EN ISO 14001 (environmental management)
Merschbrock Kunststoff Spritzguss GmbH generates over 90 % of its electricity requirements itself. Thanks to our various options for generating electricity, we achieve an almost neutral energy balance. We commissioned our first combined heat and power (CHP) plant back in 2014 and added another state-of-the-art CHP plant in 2020. We commissioned our first PV system in 2022 and our second in 2024. The waste heat from the CHP units is used directly to heat the buildings. A connected absorber system converts further waste heat into cold to ensure optimum temperature control of the injection moulds on the machines in plastics production. This ensures minimal energy losses. Thanks to these highly effective measures, we can save up to 1,100 t of CO2 every year. Good for the environment!
Up to 1,100 t CO2 savings every year
Environmental management with certificate: DIN ISO 14001
Sprues and defective parts are, wherever possible, directly regrinded and fed back into the injection moulding process. The remaining plastic waste is handed over to certified recyclers. Furthermore, we carry out customer projects with sustainable plastics such as natural fibre plastics or 100% recycled plastics.
Merschbrock Kunststoff Spritzguss GmbH generates over 90 % of its electricity requirements itself. Thanks to our various options for generating electricity, we achieve an almost neutral energy balance. We commissioned our first combined heat and power (CHP) plant back in 2014 and added another state-of-the-art CHP plant in 2020. We commissioned our first PV system in 2022 and our second in 2024. The waste heat from the CHP units is used directly to heat the buildings. A connected absorber system converts further waste heat into cold to ensure optimum temperature control of the injection moulds on the machines in plastics production. This ensures minimal energy losses. Thanks to these highly effective measures, we can save up to 1,100 t of CO2 every year. Good for the environment!
Sprues and defective parts are, wherever possible, directly regrinded and fed back into the injection moulding process. The remaining plastic waste is handed over to certified recyclers. Furthermore, we carry out customer projects with sustainable plastics such as natural fibre plastics or 100% recycled plastics.